佛山鍍鋅球接欄桿 鋅鋼欄桿 電廠平臺(tái)66球形立柱
Foshan galvanized steel balustrade 66 spherical column of power plant platform
①為了安全請(qǐng)由第一階段安裝。
① For safety, please install by phase one.
②第一階段安裝定位后,安裝第二個(gè)立柱,但不要緊固。
② After the first stage of installation and positioning, install the second column, but do not tighten it.
③穿入欄桿管件至第一根立柱半個(gè)球位,其余部分懸空。
③ Through the railing pipe fittings to the first column half ball position, the rest of the suspension.
④穿欄桿管件于第一、第二根立柱,并使其超出第一根立柱約75mm.
④ The pipe fittings through the railings shall be placed on the first and second columns and shall be about 75mm higher than the first column
⑤安裝彎頭并焊接固定。
⑤ Install the elbow and fix it by welding.
⑥安裝余下的立柱并固定。
⑥ Install the remaining column and fix it.